Construction Pages
page 1 page 2 page 3 page 4 page 5 page 6 page 7

Production is now in full swing

the main frame tubes are in the parts are laser cut
finished then welded together
more parts getting prepped jig for lining up the 'ears'
the standoffs for the cable are done cable straps
the main tubes are coming along main tube connection
building the top assembly fine adjustments with the calibration tool
building the fork assembly Alex does his magic
the top section assembling the test cycle
test ride hey ! get back to work before Ed sees this ;)

Construction Pages
page 1 page 2 page 3 page 4 page 5 page 6 page 7