| Construction Pages | ||||||
|---|---|---|---|---|---|---|
| page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 |
![]() |
![]() |
| the diagonal cables at the center of the frame | the standoff braces are done |
![]() |
![]() |
| 100 cables is a lot of crimping | everyone gets a turn |
![]() |
![]() |
| ed stopped by to check on the progress | shrinking the tubes went much better with roy's heat gun |
![]() |
![]() |
| assembling the top section | and setting up the drive system |
![]() |
![]() |
| view from the seat down | and from the wheel up |
![]() |
![]() |
| scott saves the day when some turnbuckles don't fit | it's starting to look like a spider web |
| Construction Pages | ||||||
|---|---|---|---|---|---|---|
| page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 |