Construction Pages
page 1 page 2 page 3 page 4 page 5 page 6 page 7

drill block for pins main tube end details
most of the hardware is in cable end with turnbuckle
apo finally got to see the cycle closely inspected everything and gave a big thumbs up
the standoffs on the center sectione with the cables connected
cable connection at the center of the frame checking out the test cycle
we picked up and assembled 8 saw horses and started on the first assembly
bolting together the main tubes removing the final welding burs
lining them up and this is how we get all these pictures up
the cycle is growing detail of the standoffs on the main tube
now it's starting to take shape very flimsy without the cables

Construction Pages
page 1 page 2 page 3 page 4 page 5 page 6 page 7