Construction Pages
page 1 page 2 page 3 page 4 page 5 page 6 page 7

alex made a new bottom section and a top section
adding the bottom section to the main frame and tightening it up
we started making the cables to length the cable jig
apo clipping shrink tube to length and getting a workout pressing the cable ends
positioning the standoff for measuring cable length checking the length of the standoff braces
teresa shrinking the cable end covers and the rigging begins
adding the cables to the frame as soon as they get done. this is too much fun diagonal cables detail

Construction Pages
page 1 page 2 page 3 page 4 page 5 page 6 page 7